Glen Cross Culvert
return to the gallery page
Description: Here at Glen Cross culvert, just 10 minutes north-east of Shirley Bridge, Maloney and Pepping Construction began work on repairing the underside of the existing structure in late July of 2013 and had the project completed as of December of the same year. While much of the work that was to be done here was to be completed underneath of the bridge, a large platform was installed to allow for work to be completed safely and in drier conditions. Furthermore, along with the rehabilitation work that was conducted, further concrete foundations were installed on both sides of the existing bridge to help stabilize and strengthen the existing guide rail.